Results 1 to 15 of 17

Threaded View

  1. #11
    Join Date
    Jun 2007
    Location
    ocean park
    Posts
    123
    If you are connecting to an existing monolithic slab, then you must be creating a new slab floor system, yes?
    Why not use the slab tool to show it where it goes in plan view. Add the dash line depicting the width of the footing below. You know how deep below grade the thickened edge it must be and make the slab thickness that dimension. It will look correct on the elevations. Use the rectangular polyline box tool to make the section view accurately and you can fill it with the concrete fill pattern. Easy to add the rigid insulation using the box tool again if you need that requirement.

    That is how I have been doing it and it looks fine on the construction document page where it counts.
    Gene Marteeny
    Chief Architect rookie using X2
    using ZT S1015i notebook with HDMI out
    22" HDMI monitor,
    1 tb external hard drive
    antique HP750c+ plotter driven by an even older
    xp machine dedicated solely to the plotter.
    Drawing board still set up equipped with Mayline, lamp with magnifier lens and latest electric eraser just in case....

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •