Results 1 to 15 of 21

Threaded View

  1. #10
    Join Date
    Nov 2003
    Location
    Oxnard Ca.
    Posts
    397
    Richard: I understand the process of making annotations on the plans referencing tables. My point is, if you have a fairly large table with 10 or more types or configurations of shearwall and you are only referencing one of those types, maybe describing the specific shearwall with brief notes would be better.

    Iit may not be necessary to fill up sheets with tables and schedules and a large generic lists of reference notes. Then again, it may be faster to insert tables if they are blocked and in your library. Thanks Bob L.

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •