Results 1 to 15 of 19

Threaded View

  1. #15
    Join Date
    Apr 2004
    Location
    LOCKPORT NY
    Posts
    18,655
    $2000 every 2 years

    I would consider this a near top-end system

    one can always spend $$$$ and be top-end
    probably overkill and probably a waste of money

    a nice middle of the road system for a 4 year time frame
    should be approx. $1500

    I used to spend $2000+ for a 4 year system and around 2008
    dropped my "needs" to the $1500 range

    so all depends on your needs for renders and raytraces
    and how detailed your models are

    Lew
    Lew Buttery
    Castle Golden Design - "We make dreams visible"

    Lockport, NY
    716-434-5051
    www.castlegoldendesign.com
    lbuttery at castlegoldendesign.com

    CHIEF X5 (started with v9.5)

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •