Results 1 to 4 of 4
Thread: Schedules
-
12-16-2003, 08:19 AM #1Registered User Promoted
- Join Date
- Nov 2003
- Location
- Texas
- Posts
- 65
Schedules
I have created an electrical (light fixture) schedule. Is there a way to input manufacturer information into the schedule without converting it to text and, thus, breaking its dynamic link to the 3D model?
Thanks,
jbonet
-
12-16-2003, 12:40 PM #2Registered User Promoted
- Join Date
- Nov 2003
- Location
- Texas
- Posts
- 65
Nevermind....I found it in the manual.
-
12-17-2003, 05:52 AM #3
Good Man.
DJP
David Jefferson Potter
Chief Architect ® Trainer, Beta Tester, Draftsman, Author of "Basic Manual Roof Editing" and Problem Solver
Win7 Ultimate x64 & XP Pro x32, 500 Gb Samsung SSD
AMD Phenom II X6 1090T, 8Gb DDR3 RAM, PNY 760 GTX
Chief 7-X6, Home Designer versions 7-2014
3101 Shoreline Drive #2118, Austin, Texas 78728-4446
Office Phone:512-518-3161
Main E mail: david@djpdesigns.net
Web Site:http://djpdesigns.net
My You Tube Channel
Help is just an e mail or call away!
-
12-17-2003, 06:04 AM #4Registered User Promoted
- Join Date
- Nov 2003
- Location
- Texas
- Posts
- 65
Woman, actually. I know it's hard to tell with the name I gave.