Results 1 to 4 of 4

Thread: Schedules

  1. #1
    Join Date
    Nov 2003
    Location
    Texas
    Posts
    65

    Schedules

    I have created an electrical (light fixture) schedule. Is there a way to input manufacturer information into the schedule without converting it to text and, thus, breaking its dynamic link to the 3D model?

    Thanks,
    jbonet

  2. #2
    Join Date
    Nov 2003
    Location
    Texas
    Posts
    65
    Nevermind....I found it in the manual.

  3. #3
    Join Date
    Aug 1999
    Location
    Austin, Texas, USA
    Posts
    6,117
    Good Man.

    DJP

    David Jefferson Potter

    Chief Architect ® Trainer, Beta Tester, Draftsman, Author of "Basic Manual Roof Editing" and Problem Solver
    Win7 Ultimate x64 & XP Pro x32, 500 Gb Samsung SSD
    AMD Phenom II X6 1090T, 8Gb DDR3 RAM, PNY 760 GTX

    Chief 7-X6, Home Designer versions 7-2014
    3101 Shoreline Drive #2118, Austin, Texas 78728-4446
    Office Phone:512-518-3161
    Main E mail: david@djpdesigns.net
    Web Site:http://djpdesigns.net
    My You Tube Channel
    Help is just an e mail or call away!

  4. #4
    Join Date
    Nov 2003
    Location
    Texas
    Posts
    65
    Woman, actually. I know it's hard to tell with the name I gave.

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •