Results 1 to 13 of 13

Thread: How long?

  1. #1
    Join Date
    Aug 2011
    Posts
    1,122

    How long?

    So I am curious how long it takes you guys to complete a plan set in CA? Lets pick a 2500-3000 SF med. complex home (not super simple, not super complex) - typical detailing. I'm trying to get a gauge on how long it should take me or my draftsmen.
    X5
    i7-3930k Dell XPS - 16GB Ram
    (2) 30" Dell 3008WFP Monitors
    Wacom 24HD

  2. #2
    Join Date
    May 2013
    Posts
    96
    I am also curious about this.

  3. #3
    Join Date
    Sep 2006
    Location
    The O.C.
    Posts
    1,499
    About 20 hrs.

    Andy.
    CA X-V, Sketchup 8 PRO,
    Auto-something '11
    Revit'11
    Windows 7, AMD Phenom 8 core, 12 Gigs. Ram. (Works well together).
    Andre' G. Tardif
    andytardif@gmail.com
    www.draftinginoc.com

  4. #4
    Join Date
    Mar 2009
    Location
    South East Idaho
    Posts
    77
    I recently completed a 2700 sq ft plan in 42.5 hrs. The plans were 20 sheets, including a site plan, specifications and structural engineering drafting.
    Ben Johnson
    B&B Builders
    Rigby, ID
    Chief X5
    Windows 7
    Intel(R) Core(TM) i7-2600 CPU @3.40 GHz
    16 GB Ram
    NVIDIA GeForce GTX 560

  5. #5
    Join Date
    Aug 2011
    Location
    Tri-Cities (Kennewick) WA
    Posts
    22
    I just finished this 2100 sq ft plan today. It was 6 pages with 1 page of details. I finished it in about 7 hours. This was an old plan that the builder had built several years ago and wanted it redrawn with some revisions. I didn't have to do very much designing.
    Having a good template helps a lot, along with anno sets.
    I also have adopted my own version of Scott's SAM for the plan and the layout. I make sure that the front left corner of the house is at 0,0 so that when I associate the new plan with the layout, the viewports need very little adjusting.
    I started using anno sets around the beginning of the year. I still can't believe how much time they save.
    The MRLS is fantastic also. (Thanks again Scott!)
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	2111R3C9H11CP Flyer.jpg 
Views:	159 
Size:	196.5 KB 
ID:	59738  
    Anthony St.Martin
    509-396-4636
    www.sageland-design.com
    asm@sageland-design.com
    Chief X5 - Started with v.8

  6. #6
    Join Date
    Oct 2006
    Location
    Sacramento - Bay Area - CA
    Posts
    222
    Quote Originally Posted by Sageland View Post
    I just finished this 2100 sq ft plan today. It was 6 pages with 1 page of details. I finished it in about 7 hours. This was an old plan that the builder had built several years ago and wanted it redrawn with some revisions. I didn't have to do very much designing.
    Having a good template helps a lot, along with anno sets.
    I also have adopted my own version of Scott's SAM for the plan and the layout. I make sure that the front left corner of the house is at 0,0 so that when I associate the new plan with the layout, the viewports need very little adjusting.
    I started using anno sets around the beginning of the year. I still can't believe how much time they save.
    The MRLS is fantastic also. (Thanks again Scott!)
    yes, the anno sets and lots of details, legends and notes you gathered in your library will save you big time.
    Francois
    X4

  7. #7
    Join Date
    Aug 1999
    Location
    Austin, Texas, USA
    Posts
    6,117
    I have done home plans in many parts of the USA as well as abroad, I have done plans for such in Texas in as little as 8-10 hours (six pages) and I recently finished plans for a house in Portland, Ore. that took almost 60 hours and thirty pages.
    The wild variable is NOT Chief Architect or Chief Users, but rather what is locally required and defined as "plans" by local building permit authorities. You even get a lot of difference between one plan checker and another within the same municipality.
    You must always serve your clients with a hat-tip to those who oversee and permit building projects.

    DJP

    David Jefferson Potter

    Chief Architect ® Trainer, Beta Tester, Draftsman, Author of "Basic Manual Roof Editing" and Problem Solver
    Win7 Ultimate x64 & XP Pro x32, 500 Gb Samsung SSD
    AMD Phenom II X6 1090T, 8Gb DDR3 RAM, PNY 760 GTX

    Chief 7-X6, Home Designer versions 7-2014
    3101 Shoreline Drive #2118, Austin, Texas 78728-4446
    Office Phone:512-518-3161
    Main E mail: david@djpdesigns.net
    Web Site:http://djpdesigns.net
    My You Tube Channel
    Help is just an e mail or call away!

  8. #8
    Join Date
    Aug 2011
    Location
    Tri-Cities (Kennewick) WA
    Posts
    22
    I agree with David. The building departments are very easy to satisfy compared with what most of you guys have to deal with.
    Anthony St.Martin
    509-396-4636
    www.sageland-design.com
    asm@sageland-design.com
    Chief X5 - Started with v.8

  9. #9
    Join Date
    May 2012
    Location
    Earth
    Posts
    148
    Quote Originally Posted by David J. Potter View Post
    I have done home plans in many parts of the USA as well as abroad, I have done plans for such in Texas in as little as 8-10 hours (six pages) and I recently finished plans for a house in Portland, Ore. that took almost 60 hours and thirty pages.
    The wild variable is NOT Chief Architect or Chief Users, but rather what is locally required and defined as "plans" by local building permit authorities. You even get a lot of difference between one plan checker and another within the same municipality.
    You must always serve your clients with a hat-tip to those who oversee and permit building projects.

    DJP
    Ding Ding Ding,

    David wins the grand prize. I think the question should be more like, "How long does it take you to draw a floor plan, cabs, elevations, electrical, and roof?" Or whatever combo is needed in your city. And even then my floor plan, elevation, electrical, cabs, roof (whatever) might have a lot more notes for the builder/client than the city requires. With that said it takes me about 15-20 hours to do a normal set for Dallas (and surrounding suburbs). I am a slow pony with CA. If it was Acad it would be around 8-10 hours. But I am learning everyday so that time should come down.
    Jay Wojnas
    X4, X5, & LOL AutoCad R14/2000
    Precision Designs
    http://pdglobal.com

  10. #10
    Join Date
    Jun 2005
    Location
    Southern California
    Posts
    4,874
    I simply can't tell you, every job I do is different, and what snacks are up that day.
    Perry
    P.H. DESIGNS L.L.C.
    Eastvale Calif.
    Alienware, liquid cooled
    Ver 10-"X6 x64 SSA
    WIN 8.1 PRO 64 bit
    Nvidia GTX780 3GB.
    i7 920 2.67-- 12 GB Ram
    40" led monitor

  11. #11
    Join Date
    Jul 2010
    Location
    Turkey
    Posts
    255
    Is the time for sketching and designing included in this 20 to 60 hours working process?
    Maybe it's about Autocad, but i don't remember any projects that i could complete in less than a month.
    H.Ozgur G.
    X5 Premium, Autocad, 3D Studio Max Design & V-Ray, Revit, Piranesi 2010, Lumion Pro 3.0,
    My Vimeo Page: https://vimeo.com/ozgurg/videos

  12. #12
    Join Date
    Jul 2007
    Location
    Carmel, California
    Posts
    1,355
    I am with Ozgur. Even for small remodels I usually have at least 10 hours of design work. For me it is very hard to generalize due to the fact that designing and drafting overlap. Recently I tried to establish that no project is worth bidding unless there is at least 24 billable hours in the cost (around $1500). I have done a very small job in 10 hours. That was 2 sheets and did not include elevations. That project was an interior remodel of a bathroom:
    *******
    Site measure 1.5-2 hours
    As built drawing - 1.5 hours
    Concept design and discuss with client 2 hours
    Construction docs finalize with details and research 3 hours
    Printing and submitting to Building department 1 hour
    *********
    A 2500 s.f. home for a full set of con docs if it was locked down in the design would take me at least 40 hours.
    A1 Project info and site plan
    A2 Proposed Plans (maybe A2.1 also)
    A3 Elevations (maybe A3.1)
    A4 Roof plan, Sections
    A5 Electrical plans
    A6 Reflected Ceiling Plan
    A7 Details
    A8 Details
    A9 Landscape and grading
    Structural I hand off to an engineer
    Actually I think I am up to 60 hours if it was a full set. When I do custom details I figure on about 20-30 minutes per detail. Some go faster if I have something already close but some of that time is spent sketching.
    alan lehman - Lehman Design Studio - Carmel, CA
    www.LehmanDesignStudio.com
    vX5 with the latest patch
    Intel i7-3770k cpu @ 3.5ghz, 16gb mem., Win 7, Nvidia GeForce GTX 660
    "No rest for the wicked or the freelancers."

  13. #13
    Join Date
    Apr 2004
    Location
    LOCKPORT NY
    Posts
    18,655
    there is also the communication time that needs to be considered

    each email from the client must be reviewed, analyzed, then replied

    each email to the client must be written,analyzed,reviewed

    same with phone calls etc

    a lot of time can be spent on communication

    I worked with a lot of fellow chiefers
    each time they sent a plan I had to review it, analyize it, find issues,
    document those issues, then communicate those issues
    offer solution A or solution B, gives pros/cons for each alternative
    or document the issue so the chiefer client could then fix on their own

    Lew
    Lew Buttery
    Castle Golden Design - "We make dreams visible"

    Lockport, NY
    716-434-5051
    www.castlegoldendesign.com
    lbuttery at castlegoldendesign.com

    CHIEF X5 (started with v9.5)

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •