Results 91 to 105 of 120
Thread: Materials List Revisited
-
04-05-2013, 11:04 AM #91claymcc
- Join Date
- Mar 2006
- Posts
- 20
Alan, I contacted CA's tech support and was given this; "Thank you for contacting us regarding the heated ceiling area for a Garage room. In Chief Architect, Garage rooms always have their ceiling area calculated as heated.
One way that you can work around this limitation is to specify the Garage room as an Attic room just before generating a Materials List. Before you do this, it is vitally important to make sure you TURN OFF Auto Rebuild Roofs and Auto Rebuild Foundations if you use these options; and, of course, when you're finished you will want to change the room type back to Garage.
I will be glad to submit a feature request on your behalf for greater control over whether or not a Garage is included in the heated ceiling area.
I hope that this information is helpful." I guess my follow up question should be, why does the room type take presidence over the wall and or ceiling type? If I draw a 6"wall with insulation in it, it should calculate the insulation whether it is a garage or not. If I don't want insulation I'll use another wall type. I should also be able to specify the amount or r-value of insulation as we often times use more on the house and less or none at all in the garageClay
X-5 on Windows 7
-
04-05-2013, 11:55 AM #92Registered User Promoted
- Join Date
- Jan 2001
- Location
- PINCKNEY, MI
- Posts
- 99
Clay
I agree with you on this one.
Thanks for giving me a fix for this situation.
I keep auto roofs and foundations off.
-
04-05-2013, 01:50 PM #93Registered User Promoted
- Join Date
- Feb 2000
- Location
- Ballarat Victoria Australia
- Posts
- 591
My way around these insulation calc limitations that chief has it to turn off chief insulation in material list preferences then I set my profile plan up by defining 3 new materials ceiling batts wall batts floor batts I use sheet as material type so can set the size of batts to what ever I want then I put these materials in default room settings I put ceiling batts in ceiling structure on a zero thickness layer , floor batts in foor structure again on zero thickness layer and wall batts in my defined wall types again on a zero thickness you need to put it behind other layer so it is not seen in camera views the only down side I have found with this system is that it is in the wrong section in the material list but you do get a accurate batt count
Also one other problem as if you have ceiling under roof plain I have not been able to put in extra insulation layer to roof plains
With this system I can control what rooms have insulation either from a default setting or on room by room basis it give me full control over insulation calcsLast edited by Mark; 04-05-2013 at 01:55 PM.
Mark Brehaut , Manager
3D Virtual House Architectural Visualization
Chief X5
cinema 4d 14
Vray for cimema 4d
-
04-05-2013, 04:27 PM #94Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Hi Alan,
This is one of the problems many are having. The solution continues to be a work around.
I would describe the solution provided by tech support as a workaround not a procedure.
Even your question "Is there a way to fix this?" demonstrates that something is broken.
Mark has another work around. Probably others have attempted to find a solution in different ways.
In your case just having control of what reports and what doesn't report is the solution.
We need voices like yours to continually point out that these issues need to be looked at and fixed.
*************************************
Chief said earlier post # 10
"We have a large number of ideas and requests on file to enhance the material list. I think keeping the dialog going is a good idea, the material list has the potential of being a really great tool, if you can get through the complexity. We also need to decide what to work on for each release. Things that are popular and affect a lot of users will get done quicker than those that are used by only a few.
The good news is that we have more people working on making chief better than ever before. With luck over the next few years some of these areas that have been neglected will start showing significant improvement. However, if we don't see a dialog on a particular area it's likely not going to get done. So keep posting your comments. We may not always respond but there are many of us that regularly read your posts."
***************************************
With the focus on Mac will Chief release Chief X6 to a generation of new Mac user with a flawed materials list?Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-06-2013, 03:01 AM #95
Good Thread, though i`ve been watching this movie for too many years: rolleyes:
Don`t remember how many times these threads come up, getting me all excited all for nothing to eventuate.
I would be so happy to get BIM from CA. I have done a few for calculating bricks and has been always out, lol.
First brick quantity i did i calculated 30k for the bricks and ended up using 43k
Recently i cal a 30k bricks project and i was only out by 10%.
Realized i had to improve my modeling skills.George
X5,Kerkythea,Adobe CS5.5 Design Premium,Thea,Substance Designer, Bitmap2Materials
www.gelbuildingservices.com.au
Intel, i7-3930K CPU @ 3.2GHz Graphics Card GTX-680
Memory32GB
-
04-06-2013, 04:39 AM #96Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Hi George,
Glad you are able to join the conversation.
That is a problem. As you know setting wall definitions is the key and that includes the materials definitions. Now with the brick ledge the calculations would be more reliable.
As I see it the conversation about the accuracy of the reporting gets mixed with how the materials list reports. (guilty myself)
The claim is the user hasn't used the program correctly. Of course that is not entirely correct. You may have seen in an earlier post that while a brick may be used for a window sill it's not calculated as a brick count and all concrete in a project is calculated to the foundation. Well that isn't quite right as I have discovered because the slab tool reports to exterior trim.
I take your point that this subject is not new and the encouragement from Chief to make comments because it all feed into a database of ideas can be tedious. There is only one way this issue will ever get any attention and that is for others to contribute to this conversation about why they don't use it and why they would like to use it.
I have to wonder myself! With X6 Running on Mac. Is it a smart commercial move to open new market opportunities with a broken materials list. The materials list is a feature of the promo videos and saves to the Project Browser. That is going to be a significant letdown for those that want to use that feature.
Rendering is a very useful and we use it to help our clients with visualization. Construction documents is vital the materials list is another important feature for us because it helps keep the budget under control. It doesn't catch everything but at the early design stage we need it for the big ticket items.Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-06-2013, 04:58 AM #97
Hi Ed,
Do a quick search and see how long its been that we`ve been asking about this ML.George
X5,Kerkythea,Adobe CS5.5 Design Premium,Thea,Substance Designer, Bitmap2Materials
www.gelbuildingservices.com.au
Intel, i7-3930K CPU @ 3.2GHz Graphics Card GTX-680
Memory32GB
-
04-06-2013, 05:18 AM #98
George:
way too long
here is a thread I posted in 2006
http://www.chieftalk.com/showthread....ighlight=prime
I was recently informed that CADEST may no longer be a viable alternative to the ML
since it is still 16-bit software and will probably not be updated anymore
verify this with the vendor before puchasing
another choice may be Planswift
LewLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)
-
04-06-2013, 05:26 AM #99
Hi Lew,
Yeah remember how excited we were?
When we though they were to develop with ruby? what happened to that? lolGeorge
X5,Kerkythea,Adobe CS5.5 Design Premium,Thea,Substance Designer, Bitmap2Materials
www.gelbuildingservices.com.au
Intel, i7-3930K CPU @ 3.2GHz Graphics Card GTX-680
Memory32GB
-
04-06-2013, 05:32 AM #100Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Well I guess ....It's watch this space...... As the Mac user join in.
Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-06-2013, 06:41 AM #101Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
You need to do better.!! In a silly naive way I imagined that the time has come for the materials list to at least function. Not a word of interest only empty words "the material list has the potential of being a really great tool" if I can get through the complexity. That must be a little joke at my expense.
You need to provide some feedback that has some meaning because this is a conversation that is at least 12 years old.
**** " We have a large number of ideas and requests on file to enhance the material list "***** Looks like your list goes back to at least 2001. That has to be a good list.
Last edited by Ed_Downunder; 04-06-2013 at 06:43 AM.
Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-06-2013, 08:48 AM #102Registered User Promoted
- Join Date
- Feb 2003
- Location
- Oregon USA
- Posts
- 519
Nice to see this topic getting some attention in this forum. That being said, I would have to say that given the current approach Chief appears to be taking on the ML, I for one will not be holding my breath.
Sadly, I don't much feel like wasting the breath that I also won't be holding regarding the needed improvements to the ML. I will go so far as to say that I feel it is the approach, not Chief's intention, nor any lack of technical skill that keeps them from addressing this subject in any meaningful way.
The problem as I see it is that even though it may appear to some that compiling a list of desired features might be an adequate step in moving the ML toward real improvement, the time that has passed since any real attention has been paid to the ML would tend to indicate that there is more to this story.
A list of features is fine, but to me the real problem is a lack of any real commitment on Chief's part to developing both the needed features or tools, and workable solutions for Chief users to access and report the information they need in a comprehensive manner.
The good news, as I see it, is that Chief has a wealth of resorces at their disposal to be called upon to address these issues. Both in the form of skilled programmers in house, and also Chief customers with a wide range of construction and data processing experience. Until Chief decides to take the time and effort to combine these resorces in some type of comprehensive approach to providing real solutions, I don't see much changing on this front.Rod Cole
V2 thru X5
-
04-06-2013, 11:44 AM #103
as George pointed out - maybe we just need a full version of Ruby with full API access
then some enterprising Chiefer could create a set of Ruby scripts
that gives us a decent useable ML
if CA doesn't have the resources to make these improvements
then let the user community do it....
LewLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)
-
04-06-2013, 06:55 PM #104Registered User Promoted
- Join Date
- Mar 2006
- Location
- Ashland, OR
- Posts
- 1,386
I see the process of improvements as incremental; and that one area of improvement necessitates improvements in other areas.
For example; in X5 we got window, door, and cabinet labels in elevation.
The unintended effect for Chief is that it shows the weaknesses in the schedule system. So in X6 we are likely to see improvements in the schedule system. This will point out the weakness in the component system. This in turn will point out the weakness in the material list; and so the cycle of development goes.
This is partially driven by us as users, and partially driven by the competition.
Chief fears the full implementation of Ruby because on one level it could make their need to control the direction program irrelevant. The balance will have to be a compromise where Chief can control the overall direction of the program; while users are free to make modifications that work for their individual needs. The model for this already exists with other programs.
The bottom line for me is that Chief is being far too cautious about control, at the expense of improved flexibility, and functionality.Last edited by billemery; 04-06-2013 at 07:15 PM.
-
04-06-2013, 08:25 PM #105
That’s a rational and legitimate fear, but one that is easily dealt with as Chief is well aware.
No matter how versatile, Chief would still have to develop the interface and few people would create the macros to accomplish anything related. Most would still prefer to be dependent on Chief to provide the necessary macros to perform even the most mundane tasks. And, of course, Chief would still have to provide a template of macros as examples. The control here is not in the macros or the programming language but in the hook up to Chief’s database and program commands. I doubt if Chief is concerned about losing control. It’s too easy to maintain it. The present limitations in Ruby are by design.
I’ll offer another opinion that their more concerned at what advantage this may offer compared against what effort. IMHO, they really can’t compete, at this point, with Softplan (and others) by duplicating their effort. SO, why try?
They will only be successful if they “leap frog” with a fresh approach and offer something new in Material control. To date they don’t know what that maybe. (They seem to be somewhat closed to outside suggestions- NIH). Few people here are even aware of other alternate approaches. Other than that, I expect only token improvements to deflect criticism and generate more hype.Gerry
NewCraft Home Services
Design/ Compliance Review
PE, X6 , Sketchup 8, TurboCad Pro 20
-----------------------------------
ASUS P9X79D, i7-3820, GTX680 w/4gb
-----------------------------
If the Government would just cut down more d*** trees, I'd have a much better view of the forest.