    Quote Originally Posted by Mark View Post
    You can got your material preferences and turn of insulation
    That doesn't help if we have insulation elsewhere that we need included.
    Glenn

    Chief X5
    www.glennwoodward.com.au

    Windows 7 - Home Premium
    Intel i7-920
    Gigabyte GA-EX58-UD3R
    6 Gb DDR3 1600MHz
    EVGA GTX285 1GbDDR3
    1TB Sata HD

  2. #77
    Join Date
    Mar 2009
    Location
    QLD Australia
    Posts
    218
    All this time wasting of Chief users in having simple area & volume calculations messed up is confusing and counter productive.

    This should all be simple and logical in the way that they calculate.

    Trouble Shooting these types of problems to find a work around is not published in training manuals or videos.

    If you want to put the work in to try to make ML do the full job then OK.

    I cant fully trust ML feature yet, so I will do it by hand and check ML list for reference only for now.

    BTW I am happy with the way Chief builds timber framing with no add ons and the ML development in this area is going very well.

    All the best to you work around trouble shooters for giving of your time to help others.
    Last edited by Justice; 04-03-2013 at 05:09 PM.
    Manuel Trantalis.

    1999 V6 to X5 2012.

    Dell XPS 630i Q9400@2.66GHz,
    Twin NVIDIA GeForce 9800 GT,
    8GB Ram, 64bit Windows 7 Pro.

  3. #78
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Appreciate your reply Doug,

    Happy with the calcs. This post was not about calculations. My fault for taking it off topic. I thought I discovered an error (silly me) What is under discussion is the way Chief reports. Chief still report all floors to the foundations. This is the type of reporting that I am discussing. Not all edge beams and slabs are poured as one are poured. Would like these items separated.
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

  4. #79
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Click image for larger version. 

Name:	Gap.JPG 
Views:	150 
Size:	92.8 KB 
ID:	58304. i Gerry This is the definition of Gap?
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

  5. #80
    Join Date
    Feb 2000
    Location
    Ballarat Victoria Australia
    Posts
    591
    Quote Originally Posted by Glenn Woodward View Post
    That doesn't help if we have insulation elsewhere that we need included.
    I does if you don't use chief auto calcs and do it all with your own defined materials, this way you have much better control
    Mark Brehaut , Manager
    3D Virtual House Architectural Visualization
    Chief X5
    cinema 4d 14
    Vray for cimema 4d

  6. #81
    Join Date
    Oct 2009
    Posts
    904
    Quote Originally Posted by Ed_Downunder View Post
    Click image for larger version. 

Name:	Gap.JPG 
Views:	150 
Size:	92.8 KB 
ID:	58304. i Gerry This is the definition of Gap?
    Thanks Ed, That explains the sometimes double reporting - sometimes not.

    Also I have to point out that Chief Does sometimes screw up the cals as per my posted plan.

    At any rate, If Chief isn't aware of the problems now, they never will be. No excuses now.
    Gerry

    NewCraft Home Services

    Design/ Compliance Review
    PE, X6 , Sketchup 8, TurboCad Pro 20
    -----------------------------------
    ASUS P9X79D, i7-3820, GTX680 w/4gb
    -----------------------------
    If the Government would just cut down more d*** trees, I'd have a much better view of the forest.

  7. #82
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Hi Glen,

    Really appreciate you taking the trouble to look at this issue.

    I have just looked at a recent plan back from the engineer. This plan has a 300mm x 350mm footing.

    The brick ledge is 2 courses of standard brick. that is 172. We are using vericore 305 x 90 x 162.

    It seems when the engineer wants 300mm footing he wants the thickened edge to sit on top of the footing.

    I get that chief wants to have the slab sit on top of the footing but is it right? Click image for larger version. 

Name:	Footing Detail.JPG 
Views:	276 
Size:	44.0 KB 
ID:	58305
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

  8. #83
    Join Date
    Dec 2005
    Location
    San Diego California
    Posts
    9,573
    I have commented on this before..... If CA defined a mono slab and footing being made up of three parts, this would solve my issues, Joe Carricks issues and Ed's issue. Those three parts are a concrete slab. (Usually 4" thick), sitting on a stem wall (6"-8" wide and approx. 14" tall) sitting on a footing (12"-15" wide and 6"-10" thick). Understand this is a mono pour. If the mono slab and footing were defined by these three components, it would enable us to build the footing using the minimum required sizes. I have a feeling I am singing into the wind.
    D. Scott Hall (The Bridge Troll)
    San Diego, Ca.
    Chief X-5 w/ Win 7
    Asus P6T X58 ATX Core i7
    Intel Core i7 920
    6GB (3X2) DDR3 1600
    NVIDIA GeForce 580 GTX

    The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.

    We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.

    If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall

  9. #84
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Keep singing Scott.

    You might be off key and out of tune but the lyrics hit the emotional spot!
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

  10. #85
    Join Date
    Aug 1999
    Location
    Sydney Australia
    Posts
    4,044
    Quote Originally Posted by Ed_Downunder View Post
    Hi Glen,

    Really appreciate you taking the trouble to look at this issue.

    I have just looked at a recent plan back from the engineer. This plan has a 300mm x 350mm footing.

    The brick ledge is 2 courses of standard brick. that is 172. We are using vericore 305 x 90 x 162.

    It seems when the engineer wants 300mm footing he wants the thickened edge to sit on top of the footing.

    I get that chief wants to have the slab sit on top of the footing but is it right? Click image for larger version. 

Name:	Footing Detail.JPG 
Views:	276 
Size:	44.0 KB 
ID:	58305
    Ed,
    What you indicate is not a momolithic slab.
    A monolithic slab, by definition, is done in one pour.
    That is why Chief reports only 1 quantity for a mono slab..

    To get what you want (OK,OK - close to what you want), you need to use walls with footings.
    This way, you can get your separate footing, stem wall and slab.
    The 72mm high stem wall would be made up of a concrete inner skin and brick outer skin.
    The brick skin for the wall above will only come down to the bottom of slab.

    This is far from perfect and you can't get the chamfer.
    This is an area of Chief that definitely needs some work.
    Glenn

    Chief X5
    www.glennwoodward.com.au

    Windows 7 - Home Premium
    Intel i7-920
    Gigabyte GA-EX58-UD3R
    6 Gb DDR3 1600MHz
    EVGA GTX285 1GbDDR3
    1TB Sata HD

  11. #86
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Light bulb moment. Thanks Glen. It seems that to get an accurate ML for this I have to calculate the footing as shown in the video. (I'm going to call this one a work around)

    Solved - lets move on.

    This may be more challenging. A new wall system we are investigating.

    Click image for larger version. 

Name:	SIPs.jpg 
Views:	171 
Size:	190.8 KB 
ID:	58309
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

  12. #87
    Join Date
    Jan 2000
    Posts
    4,161
    Gerry, thanks for that example. It looks as if the model is incorrect and is doubling the concrete in the area that the slab intersects the wall. If you do a glass house view of it you can kind of see where the problem lies. Unchecking monolithic slab in the room specification seems to correct the calculation in the version of X6 that I'm running. I'm on a Mac right now so can't check X5.

    I will need to check with our foundation guy but I don't think we should allow the use of Monolithic slab when using a wall with the slab footing property checked. My recollection is that a monolithic slab just puts a slab under all the rooms without looking at the walls. It may be possible that there are legitimate uses of it in conjunction with slab footing walls, but I can't think of any at the moment.
    Doug Park
    Principal Software Architect
    Chief Architect, Inc.

  13. #88
    Join Date
    Oct 2009
    Posts
    904
    Thanks Doug --- That clears up a lot of confusion -- at least on my part. I had no application , just exercising Chief.

    I knew yous guys would come through. Sometimes we just need to get your attention. --- Thinking ML update?
    Gerry

    NewCraft Home Services

    Design/ Compliance Review
    PE, X6 , Sketchup 8, TurboCad Pro 20
    -----------------------------------
    ASUS P9X79D, i7-3820, GTX680 w/4gb
    -----------------------------
    If the Government would just cut down more d*** trees, I'd have a much better view of the forest.

  14. #89
    Join Date
    Jan 2001
    Location
    PINCKNEY, MI
    Posts
    99
    I can't seem to get rid of insulation over a garage roof.
    There is no room above this and there is no insulation showing in the garage walls.

    When I remove ceiling from this area then insulation is not calculated in the material list.
    Is there a way to fix this?

    Windows 7
    X5
    Quote Originally Posted by Glenn Woodward View Post
    That doesn't help if we have insulation elsewhere that we need included.

  15. #90
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Quote Originally Posted by Glenn Woodward View Post
    Ed,
    What you indicate is not a monolithic slab.
    A monolithic slab, by definition, is done in one pour.
    That is why Chief reports only 1 quantity for a mono slab..

    To get what you want (OK,OK - close to what you want), you need to use walls with footings.
    This way, you can get your separate footing, stem wall and slab.
    The 72mm high stem wall would be made up of a concrete inner skin and brick outer skin.
    The brick skin for the wall above will only come down to the bottom of slab.

    This is far from perfect and you can't get the chamfer.
    This is an area of Chief that definitely needs some work.
    It's a two headed beast. I would like the footing to draw correctly and I would like the materials list to report correctly.

    Click image for larger version. 

Name:	SIPs.jpg 
Views:	135 
Size:	190.8 KB 
ID:	58324

    I have managed to draw it correctly

    Click image for larger version. 

Name:	R9 Footing and slab.jpg 
Views:	158 
Size:	189.8 KB 
ID:	58325



    The materials list is another thing!! The slab is reported as TRIM concrete cubic meters is OK. I have no Idea what 25mm solid concrete is. I looked for it. Must be something I added by mistake in elevation view so ignore that.

    To put an edge beam on a single level house is easy with the make room polyline copy, concentric jump convert to slab. make hole in slab and set elevation at -200.

    My current project has 3 levels slab on ground. That is a bit more complicated for this method

    On a new plan I have a 5 x 5 slab and a 5 x 5 slab with footing. It's extraordinary! The slab tool reports as Exterior trim and the slab with footing tool report as foundation slab and foundation footing with separate calculations

    The foundation slab reports 2.5 cubic meters and the footing 2.46 cubic meters.

    Click image for larger version. 

Name:	Slab tool _ slab with footing tool.JPG 
Views:	129 
Size:	91.9 KB 
ID:	58326
    Last edited by Ed_Downunder; 04-05-2013 at 05:26 AM.
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

 

 