04-03-2013, 03:27 PM #76Glenn
Chief X5
www.glennwoodward.com.au
Windows 7 - Home Premium
Intel i7-920
Gigabyte GA-EX58-UD3R
6 Gb DDR3 1600MHz
EVGA GTX285 1GbDDR3
1TB Sata HD
-
04-03-2013, 04:59 PM #77
All this time wasting of Chief users in having simple area & volume calculations messed up is confusing and counter productive.
This should all be simple and logical in the way that they calculate.
Trouble Shooting these types of problems to find a work around is not published in training manuals or videos.
If you want to put the work in to try to make ML do the full job then OK.
I cant fully trust ML feature yet, so I will do it by hand and check ML list for reference only for now.
BTW I am happy with the way Chief builds timber framing with no add ons and the ML development in this area is going very well.
All the best to you work around trouble shooters for giving of your time to help others.Last edited by Justice; 04-03-2013 at 05:09 PM.
Manuel Trantalis.
1999 V6 to X5 2012.
Dell XPS 630i Q9400@2.66GHz,
Twin NVIDIA GeForce 9800 GT,
8GB Ram, 64bit Windows 7 Pro.
-
04-03-2013, 05:33 PM #78Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Appreciate your reply Doug,
Happy with the calcs. This post was not about calculations. My fault for taking it off topic. I thought I discovered an error (silly me) What is under discussion is the way Chief reports. Chief still report all floors to the foundations. This is the type of reporting that I am discussing. Not all edge beams and slabs are poured as one are poured. Would like these items separated.Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-03-2013, 05:41 PM #79Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-03-2013, 05:45 PM #80Registered User Promoted
- Join Date
- Feb 2000
- Location
- Ballarat Victoria Australia
- Posts
- 591
-
04-03-2013, 06:21 PM #81Gerry
NewCraft Home Services
Design/ Compliance Review
PE, X6 , Sketchup 8, TurboCad Pro 20
-----------------------------------
ASUS P9X79D, i7-3820, GTX680 w/4gb
-----------------------------
If the Government would just cut down more d*** trees, I'd have a much better view of the forest.
-
04-03-2013, 06:24 PM #82Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Hi Glen,
Really appreciate you taking the trouble to look at this issue.
I have just looked at a recent plan back from the engineer. This plan has a 300mm x 350mm footing.
The brick ledge is 2 courses of standard brick. that is 172. We are using vericore 305 x 90 x 162.
It seems when the engineer wants 300mm footing he wants the thickened edge to sit on top of the footing.
I get that chief wants to have the slab sit on top of the footing but is it right?Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-03-2013, 06:40 PM #83
I have commented on this before..... If CA defined a mono slab and footing being made up of three parts, this would solve my issues, Joe Carricks issues and Ed's issue. Those three parts are a concrete slab. (Usually 4" thick), sitting on a stem wall (6"-8" wide and approx. 14" tall) sitting on a footing (12"-15" wide and 6"-10" thick). Understand this is a mono pour. If the mono slab and footing were defined by these three components, it would enable us to build the footing using the minimum required sizes. I have a feeling I am singing into the wind.
D. Scott Hall (The Bridge Troll)
San Diego, Ca.
Chief X-5 w/ Win 7
Asus P6T X58 ATX Core i7
Intel Core i7 920
6GB (3X2) DDR3 1600
NVIDIA GeForce 580 GTX
The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.
We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.
If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall
-
04-03-2013, 06:57 PM #84Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Keep singing Scott.
You might be off key and out of tune but the lyrics hit the emotional spot!Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-03-2013, 09:04 PM #85
Ed,
What you indicate is not a momolithic slab.
A monolithic slab, by definition, is done in one pour.
That is why Chief reports only 1 quantity for a mono slab..
To get what you want (OK,OK - close to what you want), you need to use walls with footings.
This way, you can get your separate footing, stem wall and slab.
The 72mm high stem wall would be made up of a concrete inner skin and brick outer skin.
The brick skin for the wall above will only come down to the bottom of slab.
This is far from perfect and you can't get the chamfer.
This is an area of Chief that definitely needs some work.Glenn
Chief X5
www.glennwoodward.com.au
Windows 7 - Home Premium
Intel i7-920
Gigabyte GA-EX58-UD3R
6 Gb DDR3 1600MHz
EVGA GTX285 1GbDDR3
1TB Sata HD
-
04-03-2013, 09:17 PM #86Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au
-
04-04-2013, 07:26 AM #87Administrator
- Join Date
- Jan 2000
- Posts
- 4,161
Gerry, thanks for that example. It looks as if the model is incorrect and is doubling the concrete in the area that the slab intersects the wall. If you do a glass house view of it you can kind of see where the problem lies. Unchecking monolithic slab in the room specification seems to correct the calculation in the version of X6 that I'm running. I'm on a Mac right now so can't check X5.
I will need to check with our foundation guy but I don't think we should allow the use of Monolithic slab when using a wall with the slab footing property checked. My recollection is that a monolithic slab just puts a slab under all the rooms without looking at the walls. It may be possible that there are legitimate uses of it in conjunction with slab footing walls, but I can't think of any at the moment.Doug Park
Principal Software Architect
Chief Architect, Inc.
-
04-04-2013, 07:47 AM #88
Thanks Doug --- That clears up a lot of confusion -- at least on my part. I had no application , just exercising Chief.
I knew yous guys would come through. Sometimes we just need to get your attention. --- Thinking ML update?Gerry
NewCraft Home Services
Design/ Compliance Review
PE, X6 , Sketchup 8, TurboCad Pro 20
-----------------------------------
ASUS P9X79D, i7-3820, GTX680 w/4gb
-----------------------------
If the Government would just cut down more d*** trees, I'd have a much better view of the forest.
-
04-04-2013, 09:31 AM #89Registered User Promoted
- Join Date
- Jan 2001
- Location
- PINCKNEY, MI
- Posts
- 99
I can't seem to get rid of insulation over a garage roof.
There is no room above this and there is no insulation showing in the garage walls.
When I remove ceiling from this area then insulation is not calculated in the material list.
Is there a way to fix this?
Windows 7
X5
-
04-05-2013, 05:19 AM #90Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
It's a two headed beast. I would like the footing to draw correctly and I would like the materials list to report correctly.
I have managed to draw it correctly
The materials list is another thing!! The slab is reported as TRIM concrete cubic meters is OK. I have no Idea what 25mm solid concrete is. I looked for it. Must be something I added by mistake in elevation view so ignore that.
To put an edge beam on a single level house is easy with the make room polyline copy, concentric jump convert to slab. make hole in slab and set elevation at -200.
My current project has 3 levels slab on ground. That is a bit more complicated for this method
On a new plan I have a 5 x 5 slab and a 5 x 5 slab with footing. It's extraordinary! The slab tool reports as Exterior trim and the slab with footing tool report as foundation slab and foundation footing with separate calculations
The foundation slab reports 2.5 cubic meters and the footing 2.46 cubic meters.
Last edited by Ed_Downunder; 04-05-2013 at 05:26 AM.
Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au