Results 1 to 15 of 120

Hybrid View

  1. #1
    Join Date
    Aug 1999
    Location
    Sydney Australia
    Posts
    4,044
    Edward,

    OK, I see what you are saying.
    The items are reported, but we need more control over how and where they are reported.
    Although the level 1 slab and level 2 slabs are reported under Foundation, at least they are separate and you can identify each one by their Floor number.

    And I totally agree that the ML needs some work.
    From my limited usage it looks like it needs the abiliity to be more easily customised by the user so that we can tell it to put the second floor slab under Concrete, (for example) if we want.
    We have the ability to edit items after the ML is generated (you can move the level 2 concrete to a Concrete Category if you want), but we really need to be able to tell Chief to put the level 2 concrete under Concrete and not Foundation BEFORE we generate the ML.
    Glenn

    Chief X5
    www.glennwoodward.com.au

    Windows 7 - Home Premium
    Intel i7-920
    Gigabyte GA-EX58-UD3R
    6 Gb DDR3 1600MHz
    EVGA GTX285 1GbDDR3
    1TB Sata HD

  2. #2
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Don't you hate it when spelling is auto corrected and somehow precisely becomes preciosity (sorry for the typo)
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •