Results 1 to 15 of 120

Threaded View

  1. #11
    Join Date
    Oct 2010
    Location
    Western Australia
    Posts
    114
    Hi Glen,

    Thanks for viewing the video. I am going to recheck AS 2870 and our engineer. I think your knowledge is a great asset to this conversation and I appreciate your comments about accurate statements. I hope I don't get marked down to much by others viewing the video because the real issue is the logic of the materials list.

    My calculations for the slab are 2.2 m³ using your figures above = 4.7 m³ If somebody can do the calcs and demonstrate that Chief reported correctly I will be relieved and continue to bring my materials list to heel.
    Edward

    CA X6 Beta

    Designer

    Intermediate skill set and reaching

    PPCM Pace Project & Construction Management.
    www.ppcm.com.au

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •