Results 1 to 15 of 120
Thread: Materials List Revisited
Hybrid View
-
04-03-2013, 07:02 AM #1Administrator
- Join Date
- Jan 2000
- Posts
- 4,161
If you find any inaccuracy in material quantity calculations please report them to us with an example and what you expected. As glen has pointed out the volumes for concrete should be accurate. Concrete can be very tough to estimate accurately by hand. Our calculations don't include any overages that are typically necessary when pouring concrete.
Doug Park
Principal Software Architect
Chief Architect, Inc.
-
04-03-2013, 05:33 PM #2Ed_Downunder
- Join Date
- Oct 2010
- Location
- Western Australia
- Posts
- 114
Appreciate your reply Doug,
Happy with the calcs. This post was not about calculations. My fault for taking it off topic. I thought I discovered an error (silly me) What is under discussion is the way Chief reports. Chief still report all floors to the foundations. This is the type of reporting that I am discussing. Not all edge beams and slabs are poured as one are poured. Would like these items separated.Edward
CA X6 Beta
Designer
Intermediate skill set and reaching
PPCM Pace Project & Construction Management.
www.ppcm.com.au