  1. #11
    Join Date
    Oct 2009
    Posts
    904
    Glen: my numbers for cals:

    Slab = 5 x 5 x .1 = 2.5 m
    Footer = 18.6 x .45 x .35 = 2.9295
    Chamfer = 18.4 x (.1 x .1)/2 = .092
    Ledge = 19.44 x .172 x .14 = .468
    Total = 5.053 exact

    I believe the wall insulation is coming from the gap material, noted as insulation gap. If you change this material wall insulation changes accordingly.

    However, attached is a similar plan using slab walls which is definitely wrong. Also, can’t figure out why chief added wall, ceiling and floor insulation on a all concrete structure and where its coming from?
    Gerry

    NewCraft Home Services

    Design/ Compliance Review
    PE, X6 , Sketchup 8, TurboCad Pro 20
    -----------------------------------
    ASUS P9X79D, i7-3820, GTX680 w/4gb
    -----------------------------
    If the Government would just cut down more d*** trees, I'd have a much better view of the forest.

 

 