Thanks Richard, I appreciate that. I told the owner that I have set the hallway width at 60" and told him that if he wants it to be narrower that he and his contractor need to talk directly to the inspector before framing is to begin. The inspector also told me that this would be great and he would give them a definate ruling at that time.
Chris Brown
CA vs. X1, X2, X3
Stone Castle Homes, LLC.
Design/Build General Contractor
Republic, Missouri
Ph. # 417-732-1027
Email chrisdbrown@att.net
-
01-16-2013, 11:11 AM #32Richard
---------------
Richard Morrison
Architect-Interior Designer
X6 Premier, Win8 64
http://www.richardmorrison.com
-
01-16-2013, 04:10 PM #33
Agreed with what Richard said. If you've got the room Chris the go ahead and leave it five wide. At the very least two people can walk side by side down the corridor.
In looking at your plan you would need a certain amount of turning room at the far doorway and therefore five feet would come into play. From a design standpoint the hallway is going to much look cleaner if you let the same width run all the way through. 6" missing from the conference room and offices won't even be noticed.
http://www.chieftalk.com/attachment....2&d=1358267009Val
Chief user since the Millenium
V-8 thru X-6
Windows 7
Dell Studio XPS 9100
x64-8gb w/1gb ATI Radeon 5800
my web page
Curbed Hamptons
-
01-16-2013, 04:26 PM #34
this chart is from the 2012 IBC amendments
LewLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)
-
01-16-2013, 07:10 PM #35
Thanks Val and Lew, I appreciate it.
Chris Brown
CA vs. X1, X2, X3
Stone Castle Homes, LLC.
Design/Build General Contractor
Republic, Missouri
Ph. # 417-732-1027
Email chrisdbrown@att.net
-
01-17-2013, 10:55 AM #36Richard
---------------
Richard Morrison
Architect-Interior Designer
X6 Premier, Win8 64
http://www.richardmorrison.com
-
01-17-2013, 11:02 AM #37D. Scott Hall (The Bridge Troll)
San Diego, Ca.
Chief X-5 w/ Win 7
Asus P6T X58 ATX Core i7
Intel Core i7 920
6GB (3X2) DDR3 1600
NVIDIA GeForce 580 GTX
The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.
We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.
If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall
-
01-17-2013, 11:40 AM #38
What Lew posted is correct but a few considerations have to be made. Most importantly, the usage of the building needs to be determined along with how many occupants might be racing towards the exit in the event of an emergency. A building and zoning official at the local municipality is definitely the one who should be able to provide the answer.
From looking at the office plan, it's probably going to be categorized under a business with office space. Business (Group B) is defined as places where services are provided. Examples: banks, insurance agencies, government buildings (including police and fire stations), and doctor's offices.
While the ADA requires a minimum clearance for wheelchair passage, the group B business occupancy classification will require a minimum 44" corridor width and if a maneuvering space is required for wheelchair turning, a 60" turning radius is required.
If 60" is needed to be able to complete a circle at the door, then why not add 16" to the entire corridor and make it continuous throughout.
-
01-17-2013, 01:26 PM #39
You have to look at ALL of the governing codes and use the most restrictive.
Richard:
I never said it was the FINAL WORD
the IBC codes are just one piece of the puzzle
LewLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)