Results 1 to 4 of 4
Thread: Schedule Labels
-
01-01-2013, 12:37 PM #1Registered User Promoted
- Join Date
- Oct 2012
- Posts
- 9
Schedule Labels
I recently upgraded to X5 and am now giving door and window schedules a go. In my old work flow I would just supress the label, call out text in "4" and assign it D01 (for instance) as an existing door. This would make this label the same size as the ones generated with the schedule tool. I would then copy the schedule, place it outside the area being sent to layout, copy it inside the area that would be seen and convert to text. I could easily mark all the existing doors or windows have the correct labels in the correct size.
No such luck with X5. Can anyone direct me to instructions on doing what I am trying to do?
Thanks!
Alex
-
01-01-2013, 02:14 PM #2
Check this out
http://www.chieftalk.com/showthread....imate+schedule
Post #1D. Scott Hall (The Bridge Troll)
San Diego, Ca.
Chief X-5 w/ Win 7
Asus P6T X58 ATX Core i7
Intel Core i7 920
6GB (3X2) DDR3 1600
NVIDIA GeForce 580 GTX
The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.
We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.
If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall
-
01-01-2013, 08:54 PM #3Registered User Promoted
- Join Date
- Mar 2006
- Location
- Ashland, OR
- Posts
- 1,386
It's quite likely that you can do what you want with a live schedule in Chief. The scheduling tools are not particularly well documented, nor are they intuitively obvious to the casual user, and there are some limits.
I would suggest that you post a simple plan showing what you have done, and what you would like to do; and we could have a go at doing it as a live schedule.
-
01-06-2013, 02:27 PM #4Registered User Promoted
- Join Date
- Oct 2012
- Posts
- 9
Thanks much guys. Will do!