Results 1 to 7 of 7

Hybrid View

  1. #1
    Join Date
    Mar 2009
    Location
    South East Idaho
    Posts
    77
    I work with two engineers who allow me to do the structural drawings which they review and stamp. The first time it was a lot of work, but now that we have worked through the specific notes and details they like to use, I use their template to very quickly provide preliminary structural notes and drawings in PDF. format that the engineer can review and red-line. Once I have incorporated the red-lines they provide me with stamped plans. This process saves time for the engineer and money for us since we are no longer paying an engineer to re-draw something we already have drawn up.
    Ben Johnson
    B&B Builders
    Rigby, ID
    Chief X5
    Windows 7
    Intel(R) Core(TM) i7-2600 CPU @3.40 GHz
    16 GB Ram
    NVIDIA GeForce GTX 560

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •