Page 1 of 2 12 LastLast
Results 1 to 15 of 18
  1. #1
    Join Date
    Jan 2007
    Location
    San Marcos, CA
    Posts
    6,805

    Door or Window ?

    Where do you put a Sliding Glass Door - Which Schedule ?

    I'm divided on this myself. I consider them to be doors, but they are generally provided by the Window Sub-Contractor.

    If I put them in the Door Schedule the Plan Checker is happy because he can see them as egress units. OTOH, the Window Sub Contractor might not see them and not put them in his bid.

    OTOH, If I put them in the Door Schedule then I can specify any extra hardware requirements.

    If I put them in Both Schedules it can get duplicated - Oooops! Chief should change that so that they can't be in both.
    Last edited by Joe Carrick; 07-06-2012 at 05:17 AM.
    Joseph P. Carrick, Architect - AIA
    ASUS M51AC Desktop, core i7-4770 CPU @3.4 GHZ, 16 GB Ram, NVidea GT640 with60M with 3GB GM, 30" HiRes (2560/1600) Monitor , (2) 24" ASUS Monitors
    Windows 8.1
    Chief Architect 9, 10, X1, X3, X4 Premium, X5 Premium, X6 Premium

  2. #2
    Join Date
    Mar 2007
    Location
    Kent, WA
    Posts
    293
    I have always put them in the door schedule. But I can see your predicament. I guess, maybe, put them in both?
    Terry Munson
    Munson Drafting Service
    Kent, WA 98032
    Author of "Learning Chief Architect Step By Step"
    "Learning Chief Architect X4 Step By Step"
    "Become an Expert Using CAX4"
    "Automatic and Manual Creation of Roofs Using CA"
    "Residential Design Using CAX5"
    terrymunson2@msn.com
    http://chiefapprentice.com

    CA vX5

  3. #3
    Join Date
    Jan 2007
    Location
    San Marcos, CA
    Posts
    6,805
    Quote Originally Posted by tmunson View Post
    I have always put them in the door schedule. But I can see your predicament. I guess, maybe, put them in both?
    Both the Door and the Window Subs bid them and we have extras. I've actually had that happen and it was a custom size so I was stuck with an extra.
    Joseph P. Carrick, Architect - AIA
    ASUS M51AC Desktop, core i7-4770 CPU @3.4 GHZ, 16 GB Ram, NVidea GT640 with60M with 3GB GM, 30" HiRes (2560/1600) Monitor , (2) 24" ASUS Monitors
    Windows 8.1
    Chief Architect 9, 10, X1, X3, X4 Premium, X5 Premium, X6 Premium

  4. #4
    Join Date
    Jan 2007
    Location
    San Marcos, CA
    Posts
    6,805
    Also, if you have them in Both Schedules then the Plan Callout Label will be whichever schedule was created last.
    Joseph P. Carrick, Architect - AIA
    ASUS M51AC Desktop, core i7-4770 CPU @3.4 GHZ, 16 GB Ram, NVidea GT640 with60M with 3GB GM, 30" HiRes (2560/1600) Monitor , (2) 24" ASUS Monitors
    Windows 8.1
    Chief Architect 9, 10, X1, X3, X4 Premium, X5 Premium, X6 Premium

  5. #5
    Join Date
    Dec 2005
    Location
    San Diego California
    Posts
    9,573
    Quote Originally Posted by Joe Carrick View Post
    Where do you put a Sliding Glass Door - Which Schedule ?
    .......................
    I put them in the door schedule. I assume the window guy will find them.
    D. Scott Hall (The Bridge Troll)
    San Diego, Ca.
    Chief X-5 w/ Win 7
    Asus P6T X58 ATX Core i7
    Intel Core i7 920
    6GB (3X2) DDR3 1600
    NVIDIA GeForce 580 GTX

    The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.

    We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.

    If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall

  6. #6
    Join Date
    Mar 2007
    Location
    Kent, WA
    Posts
    293
    Quote Originally Posted by Joe Carrick View Post
    Also, if you have them in Both Schedules then the Plan Callout Label will be whichever schedule was created last.
    Good point. I, for one, have never had a problem with putting them in the door schedule. I also include a separate sheet in my construction documents just for windows and doors and where they go.
    Terry Munson
    Munson Drafting Service
    Kent, WA 98032
    Author of "Learning Chief Architect Step By Step"
    "Learning Chief Architect X4 Step By Step"
    "Become an Expert Using CAX4"
    "Automatic and Manual Creation of Roofs Using CA"
    "Residential Design Using CAX5"
    terrymunson2@msn.com
    http://chiefapprentice.com

    CA vX5

  7. #7
    Join Date
    May 2002
    Location
    Sag Harbor, NY
    Posts
    1,424
    Does anyone draw interior views of the doors and windows?

    It's a big help and ensures that nothing gets omitted when sending the Door and Window package to the different vendors for pricing.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	door and window elevations.JPG 
Views:	530 
Size:	161.6 KB 
ID:	53450  
    Val
    Chief user since the Millenium
    V-8 thru X-6
    Windows 7
    Dell Studio XPS 9100
    x64-8gb w/1gb ATI Radeon 5800
    my web page
    Curbed Hamptons

  8. #8
    Join Date
    Apr 2004
    Location
    LOCKPORT NY
    Posts
    18,655
    Val:

    nice idea !!!

    Lew
    Lew Buttery
    Castle Golden Design - "We make dreams visible"

    Lockport, NY
    716-434-5051
    www.castlegoldendesign.com
    lbuttery at castlegoldendesign.com

    CHIEF X5 (started with v9.5)

  9. #9
    Join Date
    Nov 2011
    Location
    Whidbey Island
    Posts
    792
    Val,

    Great, I do a similar drawing but I add the window/Door number i.e. W04 over each window/door and it matches the plan.
    William Page Architects A.I.A.
    pagearch@whidbeyisland.com

    HP Pavilion dv6 Notebook
    Intel i7 CPU Q720@1.60 boost to 2.80 GHZ
    4.00 GB
    Graphics card 1GB Nvidia Geforce
    27" HDMI monitor

  10. #10
    Join Date
    Sep 2008
    Location
    Lake Placid
    Posts
    2,313
    In clad window land, where often the windows and "patio" doors (hinged or sliding, but basically, doors with full-glass lites) are from the same manufacturer, it can make sense to schedule such doors with the windows.

    This, because one set of notes about specs, finish, glass, etc., can apply to the whole schedule. It simplifies purchasing.
    Gene Davis
    SSA: X5 Premium, X4 Premium, X3, X2 (12.5.1.9), 10.08.b
    Intel i7 quad-core 64-bit HM65 express, Windows 7, 16 GB RAM, NVidia GeForce GTX560M - 3 GB GDDRS - SDRAM
    Google Sketchup 8.0
    DropBox cloud storage

  11. #11
    Join Date
    Mar 2011
    Location
    Wasilla, Alaska
    Posts
    799
    Val,

    I think window details like the ones you attached are an excellent idea. I recommended to one custom builder a while back that he include window details like that so we knew where he wanted the openings framed. Adding header heights to those details would make them even more useful.
    Michael

    Chief Architect X3-X6
    Windows 7
    I5 Quad core 8 GB
    NVIDEA Ge Force GT430

  12. #12
    Join Date
    Mar 2011
    Location
    Wasilla, Alaska
    Posts
    799
    Quote Originally Posted by Joe Carrick View Post
    ... Chief should change that so that they can't be in both.
    Joe,

    If they did that then you would be posting a suggestion asking for the option of putting them on either schedule

    And I think you should put them on the cabinet schedule.
    Michael

    Chief Architect X3-X6
    Windows 7
    I5 Quad core 8 GB
    NVIDEA Ge Force GT430

  13. #13
    Join Date
    Jan 2007
    Location
    San Marcos, CA
    Posts
    6,805
    Quote Originally Posted by Alaskan Son View Post
    Joe,

    If they did that then you would be posting a suggestion asking for the option of putting them on either schedule

    And I think you should put them on the cabinet schedule.
    Pretty funny Michael....

    Actually,there is an option for either the Door or Window Schedule. Check the "Properties" of those Schedules. It allows you to specify what types of things to include. Both Schedules allow "Sliding Glass Doors".
    Joseph P. Carrick, Architect - AIA
    ASUS M51AC Desktop, core i7-4770 CPU @3.4 GHZ, 16 GB Ram, NVidea GT640 with60M with 3GB GM, 30" HiRes (2560/1600) Monitor , (2) 24" ASUS Monitors
    Windows 8.1
    Chief Architect 9, 10, X1, X3, X4 Premium, X5 Premium, X6 Premium

  14. #14
    Join Date
    May 2002
    Location
    Sag Harbor, NY
    Posts
    1,424
    Thanks guys for the feedback. The 1/2" scale elevations are easy to generate. (And yes I do place numbers on them when they're done. Rough openings too. )

    By placing only dimensions on the unit size, we can ask all the vendors to offer a variety of pricing (for different brands) rather than just sticking with Marvin for example. It's also helpful to see the trims and identify a condition where a window might conflict with a vanity or cabinet.

    But better yet, the elevations come across as a big plus to the drawing package which helps add value to the service.
    Val
    Chief user since the Millenium
    V-8 thru X-6
    Windows 7
    Dell Studio XPS 9100
    x64-8gb w/1gb ATI Radeon 5800
    my web page
    Curbed Hamptons

  15. #15
    Join Date
    May 2008
    Posts
    468
    I put them on the window schedule, which I call the "Window & Clad Door Schedule". Any door that comes from the wdw mfr- sliding, folding, french- is on this schedule. The clad wdw/door supplier sees everything on one schedule.

    Since the bldg dept where I work requires that egress window or doors be labeled as such on the floor plan, there is no problem.

    Dorothy
    Dorothy Howard AIA
    Architect
    Coronado, CA
    dhowardaia.com

    X4 64-bit

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •