Results 1 to 15 of 23

Hybrid View

  1. #1
    Join Date
    May 2002
    Location
    Houston, Texas
    Posts
    7,619
    Something else that will help you is after you create your foundation (basement), do a backclip camera view so you can see the floor levels and then tile the views so that you can see the plan view and backclip view at the same time. You will now see the visible changes when you make them. This will help you tremendously.
    Tommy Blair
    Houston, TX.
    (713) 467-0579
    tblair55@sbcglobal.net
    Avid Chief User V8-X5
    Lead Houston User's Group
    HP Dv7t Quad Edition Laptop
    W7 Home Premium, 64-Bit
    2nd Gen. Intel Quad Core i7-2720QM 2.2 GHz (turbo boost to 3.3 GHz)
    1GB Radeon HD 6770M GDDR5
    8GB DDR3 System Memory, 640GB 7200rpm Hard Drive
    (2) 2.0 ports, (2) 3.0 ports
    17.3" Monitor (1600x900)

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •