Results 1 to 15 of 95

Hybrid View

  1. #1
    Join Date
    Jul 2007
    Location
    Carmel, California
    Posts
    1,355
    Hello Michael,

    I take my plans through the design development and anything beyond the diagrammatic wall sections gets drawn by my engineer. I show details as they relate to dimensions but the connection details are stamped by the engineer.

    When you live in California you like to spread the liability around.

    I have worked in both fashions where the engineer does all of his drawings or that I will make the structural plans and have him mark them up and review my drawings after placing his red marks on the drawings. If the project is really small I will do the mark up version. If it is any larger than about 300 s.f. of space to be engineered I will let him do all the drawings. This is to simplify the exchange of drawings and to avoid errors.

    The cost for engineering is always separate from my fee.

    Alan
    alan lehman - Lehman Design Studio - Carmel, CA
    www.LehmanDesignStudio.com
    vX5 with the latest patch
    Intel i7-3770k cpu @ 3.5ghz, 16gb mem., Win 7, Nvidia GeForce GTX 660
    "No rest for the wicked or the freelancers."

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •