Results 1 to 15 of 95

Threaded View

  1. #4
    Join Date
    May 2002
    Location
    Houston, Texas
    Posts
    7,619
    Quote Originally Posted by Alaskan Son View Post
    I have the freedom of letting the engineer take care of whatever I want, and pass that directly on to the client and cal it "engineering fees", but I would like to stick with "industry standard" and take care of whatever portion I should be taking care of myself
    I would strongly recommend having an Engineer stamp all plans or at least review it. There is a liability issue here. A stamp would be good. You say "I have the freedom of letting the engineer take care of whatever I want". Well yes and no. An Engineer is going to engineer the structural, such as framing and foundation. If that Engineer is signing off or stamping the plan, you HAVE to go with what he calls for or you do always have the option of using a different Engineer. Some foundation companies will use their own Engineers for the foundation just like truss companies. I'm pretty good at guessing what our Engineer wants 90% of the time but bottom line is, He makes all final calls if he's stamping the plan.
    Tommy Blair
    Houston, TX.
    (713) 467-0579
    tblair55@sbcglobal.net
    Avid Chief User V8-X5
    Lead Houston User's Group
    HP Dv7t Quad Edition Laptop
    W7 Home Premium, 64-Bit
    2nd Gen. Intel Quad Core i7-2720QM 2.2 GHz (turbo boost to 3.3 GHz)
    1GB Radeon HD 6770M GDDR5
    8GB DDR3 System Memory, 640GB 7200rpm Hard Drive
    (2) 2.0 ports, (2) 3.0 ports
    17.3" Monitor (1600x900)

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •