    Richard,

    I don't have contempt for it. It doesn't really bother me too much (although as much framing as I've done over the years I think I have a pretty good idea of whats required without engineering stamps). I just want to charge properly for the engineering portion.

    I have the freedom of letting the engineer take care of whatever I want, and pass that directly on to the client and cal it "engineering fees", but I would like to stick with "industry standard" and take care of whatever portion I should be taking care of myself, which is why I'm asking you you guys.