    My question is, how far do you as a designer take the plans before passing them to an engineer?
    I finish the plans with all details, beam sizes, shear walls..... everything that I think the engineer is going to require..... not a nail is left off..... not a holdown is missed.... a retaining wall is detailed....... shear transfers are on the plans....... ledger sizes and lag screws spec'd out......... He then reviews and makes adjustments...... i.e. an extra holdown or increase size of beam etc.

    Ooops, I should say I eschew ordering truss calcs and Title-24 until engineering comes back.... those items are typically a formality.

    Did I answer your question?
    D. Scott Hall (The Bridge Troll)
    San Diego, Ca.
    Chief X-5 w/ Win 7
    Asus P6T X58 ATX Core i7
    Intel Core i7 920
    6GB (3X2) DDR3 1600
    NVIDIA GeForce 580 GTX

    The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.

    We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.

    If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •