Results 1 to 15 of 95
Thread: Design vs. engineering question
Threaded View
-
04-02-2011, 01:43 PM #11Registered User Promoted
- Join Date
- Mar 2011
- Location
- Wasilla, Alaska
- Posts
- 799
rcole,
Thank you! I'm taking it that in your experience it just varies. Being that I haven't been the one drawing the plans before I wasn't sure if most designers just hand over the layout and elevations, or draw up all the details too.
I have a particular client right now who I'm doing an addition for. I included the design work in my fixed price. The engineering I included as a variable allowance item. I didn't foresee all the areas where the two would overlap each other, and I'm in position now where I just don't want to take advantage of the situation. I also don't want to do more design and layout work then is typically done by a designer.
Thanks again for any input.Michael
Chief Architect X3-X6
Windows 7
I5 Quad core 8 GB
NVIDEA Ge Force GT430