Results 1 to 15 of 23
Thread: Foundations
Hybrid View
-
06-02-2010, 07:33 AM #1Special Projects Director
- Join Date
- May 2003
- Posts
- 3,113
Chief trys to be smart about the building cuting through terrain. Certain wall types like railings etc. won't cut a hole. This allows you to build a deck with out taking out the terrain below it while still taking out the terrain for the structure.
The reason the height changes is that the area that cuts the hole is used to auto calculate the terrain.
As near as I can tell it's working as designed.Dan Park,
Special Projects Director,
Chief Architect