Page 2 of 2 FirstFirst 12
Results 16 to 17 of 17
  1. #16
    Join Date
    Aug 1999
    Location
    Seattle 98199
    Posts
    1,180
    Quote Originally Posted by joey3032 View Post
    OK...mono slab....set the height of the footing to set the "height" or depth of the stem wall.

    Is this what you need?
    Would be great to have an automatic haunch

    Ron Ravenscroft
    RAVENSCROFT ARCHITECTS, LTD.
    20611 N. 17th WAy
    Phoenix, Arizona 85024
    623-434-0092 - 480-797-6894
    rrarchpa@cox.net or ron@raltd.net
    Version4 to X5 and beyond

  2. #17
    Join Date
    Jun 2005
    Location
    Southern California
    Posts
    4,874
    Larry
    If you just drop the addition floor 1/16," it will give you 2 separate slabs. I'm not saying it will look correct in 3d and, the plan view will have extra lines to cover. That's a very simple slab and it still doesn't work as it should. Please Chief fix the mono slabs. too many workarounds for such a simple slab.
    Perry
    P.H. DESIGNS L.L.C.
    Eastvale Calif.
    Alienware, liquid cooled
    Ver 10-"X6 x64 SSA
    WIN 8.1 PRO 64 bit
    Nvidia GTX780 3GB.
    i7 920 2.67-- 12 GB Ram
    40" led monitor

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •