Results 1 to 15 of 174

Hybrid View

  1. #1
    Join Date
    Dec 2005
    Location
    San Diego California
    Posts
    9,573
    Okay, here is a good one, and has probably already been discussed but it might be a good reminder.

    After manually editing a floor joist and turning it into a flush beam, block this member with another, so if you need to rebuild the floor system again , this flush beam will remain.

    Of course it would be nice to have an option in the dbx for this joist to be retained (if CA has not already thought of it) but until then.....
    D. Scott Hall (The Bridge Troll)
    San Diego, Ca.
    Chief X-5 w/ Win 7
    Asus P6T X58 ATX Core i7
    Intel Core i7 920
    6GB (3X2) DDR3 1600
    NVIDIA GeForce 580 GTX

    The videos we watch are not 100% gold, but if we find a gold nugget, the time spent viewing has a value.

    We can please some of the people some of the time, but we can't please all the people all of the time..... but I will keep trying.

    If you are interested in keeping abreast of any new videos, please subscribe to my channel at YOUTUBE...... channel is ds hall

 

 

Tags for this Thread

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •