Results 1 to 15 of 47

Threaded View

  1. #40
    Join Date
    Mar 2012
    Posts
    1
    I'm considering getting into CA and we currently outsource our home design to designers using AutoCAD and preparing basic permit drawings. To convert say a typical 2 sty 2,000 sq ft house to a 3D CA walk through finished model - how much time would that take? From there how much time does it take (a professional user) to generate permitting drawings?
    Mike, Concord Ontario

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •