Results 1 to 12 of 12
  1. #1
    Join Date
    Sep 2008
    Location
    Lake Placid
    Posts
    2,313

    How can I get the walls I need?

    We build a lot with trusses, and our "energy heel" height is always 12 inches or more. It is common for us to do some vaulted ceilings under roof, using scissors trusses.

    Chief doesn't seem to be on the same wavelength as us. Take a look at the attached wall section, drawn in Sketchup.

    I can use Chief and do a roof manually (or auto), and get the roof up where it is with the 12" heel. I can also do a ceiling plane where needed, elevation-wise. I found out Chief's logic.

    What I cannot do, is get Chief, when framing, to place the wall top plates as they are shown in this pic.

    What's the secret? I am working in v.10.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	Wall.jpg 
Views:	805 
Size:	22.7 KB 
ID:	26818  

  2. #2
    Join Date
    Jun 2001
    Location
    Houston,Texas
    Posts
    10,154

  3. #3
    Join Date
    Sep 2008
    Location
    Lake Placid
    Posts
    2,313
    Thanks, Louis.

    I have been able to figure out, through reviewing the manual, the training, and also through experimentation with the program, how Chief computes roof plane placement. But that is not my problem.

    What I want is a wall section from Chief that shows a scissors truss with energy heel, the wall plates up at the 97-1/8" elevation (or however I have set it), the truss bearing on those plates. Just like in my Sketchup pic.

    I want to be able to represent a wall section as it will be built.

  4. #4
    Join Date
    Feb 2000
    Location
    Ballarat Victoria Australia
    Posts
    591
    I am no expert on this but i would try building the roof and in the build roof dialog put height in the raise of top draw the ceiling plane with the ceiling plane tool after that draw the trusses
    Last edited by Mark; 10-16-2008 at 05:06 AM.
    Mark Brehaut , Manager
    3D Virtual House Architectural Visualization
    Chief X5
    cinema 4d 14
    Vray for cimema 4d

  5. #5
    Join Date
    Mar 2004
    Location
    Minneapolis
    Posts
    589
    Is this something like what you want?
    Mike
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	scissorrafter.jpg 
Views:	256 
Size:	48.9 KB 
ID:	26826  

  6. #6
    Join Date
    Jul 2005
    Location
    Brownsburg, Indiana
    Posts
    5,614
    Build Roof DBX, build tab, "raise roof off plate" 12"
    Allen Brown
    Indy Blueprints
    Residential & Commercial Designs & Drafting Service
    V8-X4, Specializing in Plan Completion, Problem solving, & Chief Architect Training.

    Free Chief Architect Training Videos:
    www.IndyBlueprints.com
    Need help on a plan? Or 1 on 1 instruction? Email or call.

    www.UBuildItIndy.com

  7. #7
    Join Date
    Jun 2001
    Location
    Houston,Texas
    Posts
    10,154
    Gene,

    Your plates always build at the ceiling height. Ceiling height and plate height are the same thing. If you truss does not build to the exact configuration you need you may have to edit the truss.

  8. #8
    Join Date
    Sep 2008
    Location
    Lake Placid
    Posts
    2,313
    Mike, you give me hope. Now I just have to figure what I am doing wrong in drawing and specifying ceiling planes.

  9. #9
    Join Date
    Jun 2001
    Location
    Houston,Texas
    Posts
    10,154
    Here is what I get with a quick model.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	truss.jpg 
Views:	254 
Size:	26.8 KB 
ID:	26830  

  10. #10
    Join Date
    Jan 2006
    Location
    Elwood, Indiana
    Posts
    1,481
    Gene, they are not getting it. Chief Architect needs to address this sooner rather than later, but for now, there is no way to complete the detail you are after without some editing of the wall sections. I also use 90% truss w/ energy heel systems, and I have tried everything for you already. I still use v10 80% of the time and am now using X1 more and more....but the situation has not improved in X1 either.

    In the first pic, as most of you know, I checked no birdsmouth, raised off plate, yada..yada..and Chief detailed correctly. The truss rests on the top plates, flat out to the fascia, however..notice that the wall is trying to come up through the truss. The drywall continues, the insulation continues, the exterior cladding continues...those all require alittle editing to be correct, but not so bad.

    Now in pic two, add the scissor effect, and everything goes downhill rather quickly. All the rules of truss usage go out the door as soon as you introduce a different ceiling plane. This requires much editing, and quite frankly, I just detail this in CAD rather that the live cross sections for speed.

    As more and more of us go green, the use of energy heel truss systems will become more and more prevalent, as we find more and better ways to seal the building envelope. Having the ability to model these conditions correctly will make life easier...not that we are looking to become truss engineeres...but we do need the ability to get quick Xsections to our engineers to properly design these things for us.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	energy heel.JPG 
Views:	261 
Size:	131.0 KB 
ID:	26831   Click image for larger version. 

Name:	scissor truss.JPG 
Views:	937 
Size:	148.1 KB 
ID:	26832  
    Joey R. Martin,aibd,cgp,cga,caps
    Martin Design & Planning
    Elwood, Indiana
    Cell. 765-860-3567
    eMail. joeymdp@gmail.com

  11. #11
    Join Date
    Jan 2006
    Location
    Elwood, Indiana
    Posts
    1,481
    Well.....I thought I had tried everything. Look at this Gene. After creating the truss, I selected the truss while in backclipped Xsection, and the truss DBX came up. I selected ENERGY HEEL, hit OK, and there you go!

    I will continue to play with this function and see what else I can get to happen.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	YaHooo.JPG 
Views:	293 
Size:	121.7 KB 
ID:	26833  
    Joey R. Martin,aibd,cgp,cga,caps
    Martin Design & Planning
    Elwood, Indiana
    Cell. 765-860-3567
    eMail. joeymdp@gmail.com

  12. #12
    Join Date
    Mar 2006
    Location
    Ashland, OR
    Posts
    1,386
    I use the energy heel truss option with vaulted ceilings.

    The one thing that Chief doesn't do is place the top plate correctly if "no ceiling over this room is checked"

    I get around this by leaving the ceiling in place while I generate the wall framing, and then remove it to show the vault.
    Attached Thumbnails Attached Thumbnails Click image for larger version. 

Name:	e h truss.JPG 
Views:	655 
Size:	58.9 KB 
ID:	26838  
    Bill Emery

    OR CCB# 105259
    Ashland Home Design LLC
    Bill@AshlandHome.Net

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •