Results 1 to 15 of 40

Hybrid View

  1. #1
    Join Date
    Apr 2004
    Location
    LOCKPORT NY
    Posts
    18,655
    Those diagrams seem to be what the building dept's want ?

    I would prefer to have a graphical approach, preferably in 3D.

    Lew
    Lew Buttery
    Castle Golden Design - "We make dreams visible"

    Lockport, NY
    716-434-5051
    www.castlegoldendesign.com
    lbuttery at castlegoldendesign.com

    CHIEF X5 (started with v9.5)

  2. #2
    Join Date
    May 2006
    Location
    Lebanon, PA
    Posts
    3,069
    Quote Originally Posted by lbuttery
    Those diagrams seem to be what the building dept's want ?
    Lew - do you mean the 3D's or Iso's? I have never had a building department ask for anything in 3D or Isometric projections.

    All of my plumbing and HVAC are done in 2D with CAD....even more so - they look at the notation more so than the lines themselves...they see noted vent and trap sizes as more important than how/where the lines run throughout the house.

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •