Results 1 to 9 of 9

Hybrid View

  1. #1
    Join Date
    Oct 2004
    Location
    Denton, TX
    Posts
    4,311
    Quote Originally Posted by louis
    I'm just in a silly mode. We have more work than we can possibly do. Oh well too much is better than not enough.
    Thank you Louis and there's nothing wrong with being silly.....I can tell you enjoy your work.
    Cliff
    X6

    Vista Home Premium SP-2
    Gateway FX6800-01e
    Intel(R) Core(TM) i7 CPU 920 @ 2.67GHz
    7.00 GB RAM DDR 3........64-bit OS
    NVIDIA GeForce GTS 250/PCIe/SSE2 1024 MB Memory

  2. #2
    Join Date
    Feb 2001
    Location
    Phoenix, AZ
    Posts
    2,423
    Amber--

    Just be aware that the "s" signifies a step in the foundation. So if you wanted a step, then you are spot on. But if you don't want a step, adjust the plan platforms and the step will go away along with the corresponding "s". The step can be seen in elevations (the foundation overview is particularly helpful in these situations).

    HTH

    Ben Palmer
    arizona custom home design
    www.palmerhomedesign.com



    follow us on facebook

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •