Results 31 to 38 of 38
Thread: Toilet in the Doorway!!!
-
01-27-2006, 09:28 AM #31Member-Cliff Cain
- Join Date
- Oct 2004
- Location
- Denton, TX
- Posts
- 4,311
Louis,
Maybe similar to the plan I sent to you. Where on my computer, I couldn't shift/select multiple walls and change their wall type correctly. It worked on yours, but not mine. I ended up creating a new template plan, imported the same wall types, layer sets, and now works fine.Cliff
X6
Vista Home Premium SP-2
Gateway FX6800-01e
Intel(R) Core(TM) i7 CPU 920 @ 2.67GHz
7.00 GB RAM DDR 3........64-bit OS
NVIDIA GeForce GTS 250/PCIe/SSE2 1024 MB Memory
-
01-27-2006, 09:35 AM #32
This may be a bug in ver 10.
Sometimes when I click on a library object my cursor turns into a toilet but so far it has always placed the object I wanted.
sometimes I have the normal cursor ?
I thought it was strange to have a toilet for the cursor but just assumed it was the default for the library and didn't give it too much thought since I always got the right object.
Next time it happens I'll pay attention to the situation.
LewLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)
-
01-27-2006, 04:04 PM #33
Lew,
The only problem with that idea is that this is 9.5.
-
01-27-2006, 04:26 PM #34
Ok, I missed that.
But I still get toilet's shapes for my library cursor in ver 10 ?
LewLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)
-
01-28-2006, 04:12 AM #35Registered User Promoted
- Join Date
- Aug 1999
- Posts
- 6,414
Originally Posted by louis
do you have the .alb file or are you only copy/pasting from a plan file?...is greg placing the symbol from a library into the new plan?
louis,
once a symbol is placed in a plan it loses its association to the library one and it is stored with the plan...so if you are only in possession of the plan, copy/paste will only copy/paste what is there...ie the toilet doorway...you would need to then change the doorway symbol's dwg file within the plan
gregg,
send me the plan and the .alb file with the doorway in it and I will take a look at your problem
click to send to Tim O'Donnell
-
01-28-2006, 07:35 AM #36Originally Posted by Tim O'Donnell
I have done that and sent Greg the plan with it fixed. I think Greg may have created this problem when he unblocked some of the units and then put them back together in a different configuration but I'm not sure why it would added a toilet to the mix.
Right after he asked the question I showed him how to get around this problem so he could move on. He is finished with the plan. I also showed him a fixed library item. What I don't get is why it seems to act one way on Greg's machine and another on mine. ...and we're not quite sure how it did this.
The only way I know of to do this is to swap the 3D dwg for the door and Greg says he did not do that.
Tim the problem is exactly what you thougt it was. We just don't know how it got there.Last edited by louis; 01-28-2006 at 07:59 AM.
-
01-28-2006, 08:13 AM #37Registered User Promoted
- Join Date
- Aug 1999
- Posts
- 6,414
The only way I know of to do this is to swap the 3D dwg for the door and Greg says he did not do that.
-
01-28-2006, 12:46 PM #38Registered User Promoted
- Join Date
- Dec 2004
- Location
- Willamette Valley, Oregon
- Posts
- 477
is it april yet
heh greg april fools
( im not resposible ,by the way,for your problem)
but it now looks like its someone in your office, since the "masters" have looked at itJosh
www.silverhammer.biz