Results 1 to 2 of 2

Thread: Schedules

Threaded View

  1. #1
    Join Date
    Sep 2003
    Location
    Jacksonville, FL
    Posts
    333

    Schedules

    I am making up a master room finish schedule. I outlined it in Excel, copied it and pasted it in CA. Should I save this in the library or cad block so can add or change it as required? What have some of you done for the finish schedule?

 

 

Posting Permissions

  • Login or Register to post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •