Results 1 to 2 of 2
Thread: Schedules
-
11-21-2005, 09:36 AM #1Registered User Promoted
- Join Date
- Sep 2003
- Location
- Jacksonville, FL
- Posts
- 333
Schedules
I am making up a master room finish schedule. I outlined it in Excel, copied it and pasted it in CA. Should I save this in the library or cad block so can add or change it as required? What have some of you done for the finish schedule?
-
11-21-2005, 03:42 PM #2
I SAVED MINE INTO THE LIBRARY AND AS NEEDED BRING INTO A CAD DETAIL. AMEND AS REQUIRED AND SEND TO LAYOUT
michael gilson
http://www.remodelphoenix.com
ACCUREST@COX.NET