    I need to be able to draw a screened porch connected to a home at the walk-out basement level. I called Chief tech. support about a month ago, the support agent mentioned a 'point to point' move to change my bsmt. to floor 1 and main floor to floor 2. Changes were made shortly after that (by the customer) to remove the screened porch, now it's back again and I have to be able to add complicated a complicated roof structure on the basement level. Since chief won't allow me to do this, I would appreciate some advice on the subject (the point to point move in the help index doesn't go into much detail about this).

    -For the most part, the house is complete. I don't want to have to do a lot of re-work.

    Thanks

  2. #2
    Join Date
    Oct 2005
    Location
    Ontario
    Posts
    159
    Typo!! only one 'complicated'

  3. #3
    Join Date
    Apr 2004
    Location
    LOCKPORT NY
    Posts
    18,655
    Which version of Chief ?

    Procedure for ver 10 is different than earlier versions.

    Lew
    Lew Buttery
    Castle Golden Design - "We make dreams visible"

    Lockport, NY
    716-434-5051
    www.castlegoldendesign.com
    lbuttery at castlegoldendesign.com

    CHIEF X5 (started with v9.5)

  4. #4
    Join Date
    Oct 2005
    Location
    Ontario
    Posts
    159
    10.06a

  5. #5
    Join Date
    Aug 1999
    Posts
    6,414
    go to the basement level...then...on the menu...build>floor>insert new floor

 

 