Results 1 to 2 of 2
Thread: window schedule
Threaded View
-
03-29-2001, 09:56 PM #1Registered User Promoted
- Join Date
- Mar 2001
- Posts
- 3
window schedule
Having trouble adapting the window schedule to my needs. When the window unit is actually comprised of many smaller windows, for instance, fixed over awning ,2 or 3 wide, thes come from the mfg all mulled together as one large unit. I need this to be listed in the schedule as one unit with the rough opening for the complete system. How can I edit the schedule? Is there anyway to import a spreadsheet type schedule from another program such as "Works" if Chief cannot handle this?