Results 1 to 3 of 3
-
03-03-2005, 02:17 PM #1Registered User Promoted
- Join Date
- Feb 2005
- Location
- Connersville, Indiana
- Posts
- 445
Wall types & Material from9 to10l???
Can some one refrish me on transfering wall types I have created in 9.54 and new materials I have created to 10.0? Ps. been through learning disk on 10.01a and foundations inperticular and they steal as far as I'm consered are telling it wrong. When you pour a basement wall you pour it 96" and when you pour 4" concrete floor and it sets on your footer your ceiling hieght is not 92", its 93 1/2". Your first floor system does not set on the wall but on the sill plate. You tell a basement wall man to pour you a 94 1/2" wall and he will laugh at you, that's what they got 8' forms for. sorry for getting side tract
David P.
From Broderbund to x5
-
03-07-2005, 04:50 PM #2
DP,
What does "refrish" mean? Seriously you export "wall deffinitions" from 9 or whatever and then "Import" those exported wall deffinitions into 10.
DJP
David Jefferson Potter
Chief Architect ® Trainer, Beta Tester, Draftsman, Author of "Basic Manual Roof Editing" and Problem Solver
Win7 Ultimate x64 & XP Pro x32, 500 Gb Samsung SSD
AMD Phenom II X6 1090T, 8Gb DDR3 RAM, PNY 760 GTX
Chief 7-X6, Home Designer versions 7-2014
3101 Shoreline Drive #2118, Austin, Texas 78728-4446
Office Phone:512-518-3161
Main E mail: david@djpdesigns.net
Web Site:http://djpdesigns.net
My You Tube Channel
Help is just an e mail or call away!
-
03-07-2005, 05:09 PM #3Registered User Promoted
- Join Date
- Feb 2005
- Location
- Connersville, Indiana
- Posts
- 445
Funny, Some how By the time I type things in here and the time they get posted some how the spelling gets off, I have noticed that alot with others post as well, But I am curtious enough not to say anything. David i have done the materials but can't seam to get the walls. Will I have to redue the materials I have on the walls when I get them moved? YYYhanks, David
David P.
From Broderbund to x5