I will be going to meet the customer along with the builder
The builder will determine scope/feasability of project and cost. I will listen to customer's wants/needs and base re-model on that and input from builder.
I would then meet with the customer and builder for up to 3 drafts (minor) of the re-model before requiring an additional fee
either flat-rate or hourly.
If we were to charge by sqft I would do it by area of as-built and re-model that we actually model. If they only want a kitchen re-model then we would only model that room. This is where the
"minimum fee" might have to be used.
I prefer the 3% of project cost as this builder won't touch a kitchen re-model under $100kLew Buttery
Castle Golden Design - "We make dreams visible"
Lockport, NY
716-434-5051
www.castlegoldendesign.com
lbuttery at castlegoldendesign.com
CHIEF X5 (started with v9.5)